PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Close up Shear Wall forms at Elev. 5-6 2nd Floor Facing South (800x600).jpg Pouring Concrete at Monumental Stair Wall forms Facing South-East (800x600).jpg Pouring concrete at Monumental stair wall froms Facing East -2 (800x600).jpg Pouring concrete at Monumental stair wall froms Facing East (800x600).jpg Back side of the Curtain Wall Mockup  (800x600).jpg
Next page Close up Shear Wall forms at Elev. 5-6 2nd Floor Facing South (800x600)
Close up Shear Wall forms at Elev. 5-6 2nd Floor Facing South (800x600)